Navigating Construction Dewatering in Utah: Requirements and Testing
- AccenaGroup
- Apr 9
- 3 min read
Construction projects in Utah often require dewatering to create safe and workable conditions. However, it's crucial to understand and comply with the specific regulations and testing procedures in place to protect the environment. This guide will walk you through the essential aspects of Construction Dewatering in Utah, including the key Utah Dewatering Requirements and the necessary Dewatering Testing in Utah.

Understanding Utah Dewatering Requirements
Before commencing any dewatering activities in Utah, it's essential to understand the regulatory landscape. Generally, the requirements involve several key components:
Dewatering Control Plan: A comprehensive plan outlining how dewatering will be managed.
Dewatering Permit: Obtaining the necessary permit from the relevant authorities is a crucial step.
Daily Visual Inspection: Regular checks to ensure the dewatering system is functioning correctly and there are no signs of pollution.
Weekly Sampling: Collecting water samples for laboratory analysis to monitor water quality.
Lab Testing: Analyzing the collected samples for specific parameters.
Monthly Reporting: Submitting reports detailing the dewatering activities and test results.
Key Sampling Parameters and Limits
The Utah Dewatering Requirements specify several parameters that need to be monitored through weekly sampling:
Oil and Grease: A daily visual check is required, and if a sheen is observed, dewatering must stop immediately. Weekly samples must not exceed a maximum limit of 10 mg/L.
pH: Weekly samples are necessary and must be kept cool for accurate measurement. The pH level should be between a minimum of 6.5 and a maximum of 9.0.
Suspended Solids: Weekly samples are required, with a daily maximum limit of 70 mg/L, a weekly average maximum of 35 mg/L, and a monthly average maximum of 25 mg/L.
Dewatering Testing in Utah: Ensuring Compliance
Dewatering Testing in Utah is critical to ensure that the water discharged from construction sites meets the required quality standards. This involves consistent weekly sampling and laboratory analysis of the parameters mentioned above. Proper handling of samples, such as keeping pH samples cool, is essential for accurate results.
Best Management Practices (BMPs) for Dewatering
Several Best Management Practices (BMPs) can be employed to effectively manage construction dewatering in Utah:
On-Site Detention: This is often considered the best option as it allows water to settle naturally. It typically doesn't require a Dewatering Control Plan, permit, sampling, or reporting.
Sedimentation Bag: A low-cost and effective method for sediment removal. However, changing bags can be cumbersome, sampling can be difficult, and it may not be suitable for very high flow rates.
Weir Tanks: These are effective for higher flow rates (potentially requiring a second tank for flows over 400 gpm) and offer easy maintenance. However, they can be expensive and less effective with clay or small particles, often requiring pairing with sedimentation bags.
Filter Chamber Tanks: Very effective for removing small particles and clays. They are smaller than weir tanks but require high maintenance due to frequent cleaning. They can also filter oil and grease with the right filters but need a separate pump.
Tips and Tricks for Effective Dewatering
Here are some helpful tips for managing construction dewatering in Utah:
Utilize onsite vegetation whenever possible to help with natural filtration.
If initial lab tests show high levels of contaminants, take more samples throughout the week to potentially bring the average down.
When starting the pump, run the water into a container or hole for a few minutes before taking a sample to ensure a representative sample.
Conclusion
Navigating the complexities of Construction Dewatering in Utah requires a thorough understanding of the Utah Dewatering Requirements and consistent Dewatering Testing in Utah. By adhering to the regulations, implementing appropriate BMPs, and following best practices for sampling and testing, construction projects can effectively manage dewatering while protecting Utah's valuable water resources.